Critical Load Panel Planner

Most residential battery installations back up part of a house, not all of it. Which part is a decision, it is made before the permit is submitted, and it is the most common gap between what a proposal implied and what the finished system does.

Two limits, and they are independent

Power is what the inverter can deliver at any instant — exceed it and the system trips no matter how full the battery is. Energy is how long the battery can keep delivering — a list within the power limit still drains in a predictable time.

A circuit list can pass one and fail the other, so they are reported separately. The load that most often fails a system is a motor starting, which is why starting watts are asked for on their own. An unentered figure is reported as missing rather than assumed.

1. What the equipment can do

These four figures come from the proposal or the equipment datasheet, not from this page. Continuous output and surge are inverter ratings; usable capacity is a battery rating and is normally lower than the headline capacity.

2. What you want backed up

Running watts and starting watts are on the appliance nameplate. Enter the starting figure only for motor loads — pumps, compressors, air conditioning — because those are the loads that trip an inverter on a rating the running figure says is fine. A 240-volt circuit takes two panel spaces.

Spaces:Priority:
Spaces:Priority:
Spaces:Priority:
Spaces:Priority:

3. Where the list is recorded

The arithmetic above decides what is possible. These four questions decide what actually gets built, and they are the ones that go unasked.

Is the circuit list written into the proposal or contract?

Not 'essential loads backed up'. The actual circuits, named. This is the document that decides what happens during an outage, and it is the one most often silent.

Does the plan set submitted for permit show the backup panel and its circuits?

The jurisdiction reviews the plan set. A circuit list agreed verbally and absent from the drawings is not part of the permitted scope.

Has someone confirmed the existing main panel has room for the backup panel feeder?

A backup panel needs a feeder from somewhere. Where the main panel is full, that is a main panel upgrade — a cost that appears after the sale unless it was surveyed.

Has the list been walked through with whoever lives in the house?

The engineering constraint is the installer's. The ranking of what matters is not.

Result

Start with the equipment ratings

Two limits decide what a battery backs up, and they are independent. Power is what the inverter can deliver at any instant. Energy is how long the battery can keep delivering it. A list can pass one and fail the other. Enter the ratings from the proposal, then list the circuits you want.

Power — the instant limit

No circuit wattages entered yet.

4 listed circuits have no wattage entered and are not included in that total.

Surge — the motor problem

No starting wattages entered. If nothing on the list has a motor, that is the correct answer; if something does, this is the limit most likely to be hit.

Energy — how long it lasts

No circuit needs both a wattage and an hours-per-day figure yet.

4 listed circuits have no hours-per-day entered and are not included in that figure.

Panel spaces

4 spaces needed for 4 circuits. No panel size entered to test it against.

Informational use only, please verify before you rely on it

This tool performs arithmetic on figures you supply. It makes no code claims and asserts no product specifications: the inverter continuous and surge ratings, the battery usable capacity and every circuit wattage are entered from your own datasheets and nameplates, and a blank entry is reported as blank rather than filled with an assumption. It does not size conductors, overcurrent protection or the feeder to the backup panel, and it applies no derating factors. Equipment compatibility constrains which backup arrangements a project can use. The system design belongs to the licensed electrical contractor and the engineer of record, and the permitted scope belongs to the plan set the jurisdiction reviews.

This tool is provided for general informational and educational purposes only. Its output is an illustrative estimate generated from the values you enter and from general assumptions that will not match every deal, market, lender, or homeowner. It is not tax, legal, accounting, financial, or professional advice, and it is not a quote, an offer, a credit decision, or a guarantee of pricing, approval, timing, savings, or eligibility.

You are solely responsible for independently confirming all information presented here including any figures, rates, fees, margins, timelines, tax treatment, and federal, state, local, or utility incentives, with the applicable lender, authority having jurisdiction, and your own qualified tax, legal, and financial advisors before acting on it, relying on it, or presenting it to a homeowner or any third party. Incentive programs, lender terms, and permitting requirements change frequently and vary by jurisdiction.

Seamless Home is not a tax advisor, law firm, lender, or licensed installing contractor, and makes no representation or warranty as to the accuracy, completeness, or currency of the information produced by this tool. To the fullest extent permitted by law, Seamless Home accepts no liability for any decision made or action taken in reliance on it.

Why the list is the decision

Circuits are physically moved into a backup panel during installation, which means the decision about what belongs on it has to be made before the work is designed rather than on the day of the install. What is a critical load panel sets out who decides, what the alternatives are, and why the circuits people argue about are always the large electric ones.

The other half of the problem is where the equipment can go at all. Where a home battery can and cannot be installed covers the siting rules, and the home battery siting checker works the same way this one does — a prohibited location ends the analysis before any capacity question is worth asking.

Where the list does not fit, the usual answers are a larger panel, a main panel upgrade, or a shorter list — and the first two are adders somebody has to absorb if they were not priced before signature. For homeowners weighing storage, battery backup is the place to start.

Frequently Asked Questions

What is this tool actually testing?+

Four limits, against figures you enter. The running watts of the circuits you want backed up, summed and tested against the inverter's continuous output rating. The largest single starting draw, added to everything else already running, and tested against the inverter's surge rating. The daily energy those circuits consume, tested against the battery's usable capacity. And the number of panel spaces the list needs, tested against the spaces available. A list can pass one of these and fail another, which is why they are reported separately rather than as a single verdict.

Why does it ask for starting watts separately?+

Because motors are the loads that fail a backup system on paper that looked fine. A well pump, a sump pump, a compressor or an air conditioner draws a large transient at startup and a much smaller figure while running. An inverter can be comfortably within its continuous rating and still shut down the instant that motor starts. The tool takes the worst realistic case — the largest motor starting while everything else on the list is already running — rather than assuming every motor starts at once, which would be pessimistic, or ignoring startup entirely, which is how the problem gets missed.

Where do I get the wattage figures?+

From the nameplate on the appliance, and from the equipment datasheet for the inverter and battery. This tool deliberately does not supply default wattages. Typical figures vary widely by model and by age, and a planner that fills in an assumption produces a confident answer to a question nobody asked. A circuit with no wattage entered is reported as missing and is excluded from the totals rather than estimated.

Why does usable capacity matter more than the headline number?+

Because usable capacity is what the system will actually deliver, and it is normally lower than the nominal capacity printed in marketing material. Manufacturers reserve a portion of the pack, and some systems reserve more in certain operating modes. Entering the nominal figure produces a runtime estimate that is optimistic by exactly the amount of the reserve. If the proposal does not state usable capacity, that is itself worth asking about before signature.

What are the four documentation questions for?+

They are the part that decides what gets built. The arithmetic establishes what is possible; the record establishes what happens. A circuit list agreed in conversation and absent from the proposal and the plan set is a list that will be reconstructed on installation day from whatever is physically reachable in the existing panel — which is how a household ends up with a backed-up hallway light and a refrigerator that is not on the list. Panel space is on that list too, because a backup panel needs a feeder from the existing main panel, and where the main panel is full that is a main panel upgrade nobody budgeted.

Does this tell me whether whole-home backup is possible?+

Indirectly, and honestly. Whole-home backup is achievable; it generally requires more inverter capacity, more storage, some form of load management, or a combination. If you list every circuit in the house and the result exceeds the continuous rating, that is the arithmetic telling you the proposal in front of you is a partial-backup proposal, whatever the conversation implied. That is a useful thing to establish before signature rather than during the first outage.

Is this a design or an engineering determination?+

No. It is a preparation aid. It performs arithmetic on figures you supply and asks questions about where the decision is recorded. It makes no code claims, applies no derating factors, and does not size conductors, overcurrent protection or the feeder to the backup panel. The system design belongs to the licensed electrical contractor and the engineer of record, and the permitted scope belongs to the plan set the jurisdiction reviews. Use this to arrive at that conversation with a list rather than without one.

Settle the backup list before the permit, not on installation day