Quick answer

A typical residential PV solar installation takes one to three days on site. The crew sets up safety equipment, installs mounting hardware and flashing at each roof penetration, lays racking, mounts the panels, runs conduit and wiring, and fits the inverter and any electrical upgrades. At the end the system is complete but deliberately left switched off. It cannot legally produce power until the work has passed inspection by the authority having jurisdiction and the utility has granted permission to operate, which usually takes additional weeks after the crew has left.

Installation day is the part of the process everyone pictures, and it is usually the shortest and least eventful stage of the whole project.

It is also the stage that produces the most surprise, for one specific reason: at the end of it, you have a complete PV solar system that is switched off and will stay that way for some weeks.

Here is what actually happens.

Before the day

By the time a crew arrives, a fair amount has already occurred: a site survey, a system design, structural and electrical review, a permit application to the authority having jurisdiction, permit approval, and equipment ordering and delivery. Where a project has taken longer than expected to reach this point, the cause is usually in that list rather than in scheduling, why solar projects stall after the sale covers where the time actually goes.

Your preparation is straightforward:

  • Clear vehicles from the driveway; crews need space for a truck and materials.
  • Clear access to the electrical panel, and to the attic hatch if there is one.
  • Secure pets indoors, away from the work area and away from doors that will be propped open.
  • Move fragile items from walls and shelves near where drilling will happen, vibration travels.
  • Clear the side of the house where panels will be lifted.
  • If roof access requires crossing a neighbour's property, arrange it beforehand.

Then take dated photographs of your roof and, if accessible, the underside of the roof deck in the attic. It takes five minutes and, in the uncommon event of a later dispute about a leak, it is the most useful evidence you can have. The reasoning is in who is liable if a solar installation damages your roof.

The day itself

Arrival and setup

The crew introduces themselves, confirms the plan, and identifies the crew lead, the person to raise anything with. Fall protection and safety equipment go up first, materials are staged, and the crew confirms panel layout against the approved design.

Ask who the crew lead is and get a direct way to reach them. It makes everything else easier.

Mounting hardware and flashing

The most consequential part of the day, and the part that determines whether you have a problem in three years.

Each attachment point is located against a structural member, the roof covering is opened, and a mount is fitted with flashing designed to shed water. Correct flashing and sealing at every penetration is the difference between a roof that stays dry and the most common serious complaint in residential PV solar.

It is also, from the ground, entirely invisible once the array is on. This is work you are trusting the crew to do properly.

Racking

Rails are attached to the mounts and aligned. Alignment here determines whether the finished array looks straight, so it is worth a glance from the ground while it is still being set rather than afterwards.

Panels

The visible part, and usually quick: panels are lifted, seated, clamped and connected in strings.

Electrical work

Conduit is run, the inverter is mounted (commonly at the panel or on an exterior wall), and connections are made to your electrical system. Depending on the design this may include a new disconnect, a production meter, monitoring equipment, and a main service panel upgrade if your existing panel cannot support the addition.

This is when your power goes off, typically for a few hours. Your installer should tell you roughly when. Say in advance if anything in the house cannot tolerate an outage.

Labelling, tidying and walkthrough

Code requires specific labelling on disconnects, conduit and equipment. This is checked at inspection, so it is not decoration. The crew cleans the site, and a magnetic sweep for dropped screws is standard practice on a well-run job.

Then a walkthrough. Do it properly:

  • Look at the array from the ground. Obvious misalignment is much easier to raise now.
  • Ask where the shutdown switch is and how to use it. You should know this before you need it.
  • Check disconnects and the inverter are labelled.
  • Confirm the site is clean and your property is as you left it.
  • Ask what happens next and roughly when.
  • Raise anything that looks wrong immediately, while the crew is still there.

Why nothing happens next

At the end of installation you have a complete system that is deliberately switched off.

Two things still have to happen:

Inspection. The authority having jurisdiction inspects the work against the approved plans and the applicable code. If something does not comply it is corrected and re-inspected, which means scheduling another visit.

Permission to operate. Your utility must approve the system's connection to the grid. This normally follows the passed inspection and involves the utility's own process and timelines, sometimes including a meter change.

Only after permission to operate may the system be turned on. Switching it on beforehand is not a shortcut. It can breach your interconnection agreement and your permit, and it puts the responsible contractor in a difficult position.

The wait is commonly several weeks and is largely outside your installer's control, though a well-prepared submission moves faster than a poorly prepared one, the PTO and interconnection checklist sets out what a complete one contains. The full picture is in interconnection and permission to operate.

What to expect afterwards

  • Inspection, and re-inspection if corrections are required.
  • Permission to operate from the utility.
  • Commissioning. The system is switched on and checked, and monitoring is configured. Make sure you can log into monitoring yourself.
  • Your documents: permit and inspection sign-off, equipment list with serial numbers, warranty documents, and the interconnection approval. Keep these together. They are exactly what you would need if the installing company were ever no longer around.

The bottom line

Installation day is short, noisy for a while, and ends with a system that does not yet work. That last part is normal and legally required, not a fault.

The parts worth your attention are at the edges: photograph the roof beforehand, be present for the walkthrough, learn where the shutdown switch is, and collect your documents. The work that determines whether the installation lasts, the flashing at each penetration, is the part you will never see, which is why the licensed contractor responsible for it matters more than any other choice in the process.

Want to know exactly who would be accountable for your installation? Get in touch.

Frequently asked questions

How long does a solar installation take?

Most residential PV solar installations take one to three days on site. A straightforward roof-mounted array on a simple roof can be a single day. Additional time is needed for larger systems, complex or multi-plane roofs, ground mounts, battery installation, or where a main service panel upgrade is required. Your installer should give you an estimate in advance based on your specific design.

Do I need to be home during the solar installation?

Usually you need to be present at the start so the crew can access the property, the electrical panel and often the attic, and at the end for a walkthrough. Many installers ask that an adult be present or reachable throughout. You will not need to be involved in the work itself, but there will be a period when the power is switched off.

Will my power be off during installation?

Yes, for a period, usually a few hours while the electrical connection is made. Your installer should tell you roughly when. Plan for anything that matters, home working, medical equipment, freezers, and mention any specific requirements before the day rather than on it.

Why doesn't my solar system work immediately after installation?

Because it is not permitted to yet. Once installation is complete the work must be inspected by the authority having jurisdiction, and the utility must grant permission to operate before the system may export or, in most cases, run at all. Switching it on before then can breach your interconnection agreement and your permit. The wait after installation is commonly several weeks.

What should I do to prepare for installation day?

Clear vehicles from the driveway, clear access to the electrical panel and to any attic hatch, secure pets indoors away from the work area, move fragile items from walls and shelves where drilling will happen, and remove obstacles from the side of the house where the array will be lifted. If your roof is accessed over a neighbour's property, arrange that in advance.

How much noise and mess should I expect?

There is real noise: drilling, hammering, an occasional impact driver, and crew moving equipment on the roof. Expect it to be intermittent through the working day. A competent crew cleans up as they go and does a magnetic sweep for dropped screws and offcuts at the end. Ask about cleanup expectations in advance if it matters to you.

What should I check before the crew leaves?

Walk the site with the crew lead. Look at the array from the ground for obviously uneven alignment, check the inverter and any disconnects are labelled, ask where the shutdown switch is and how to use it, confirm the site is clean and your belongings are as you left them, and ask what the next steps and expected timings are. Note anything that looks wrong immediately rather than after the crew has gone.